There are three decisions that shape most of the cost of commercial fence installation: how many gates the site needs, which of them are automated, and how tall the fence has to be. Height also decides the permit path. In Tacoma, any fence over seven feet needs a building permit. In Lakewood, a fence taller than six feet in a setback or on a property line needs a variance as well. All three take time to work out, so the right time to start is before next year’s capital budget is set.

Why Plan a Commercial Fence Before the Year Ends?
If your business sets its budget by calendar year, the amount you approve this fall is the amount you’ll have to work with next year. Permits add time on top of that. In Tacoma, the city’s target for the first review of a commercial alteration permit is four weeks, and the average permit goes through almost two rounds of review before it’s issued. In Lakewood, the code sets no deadline for deciding a variance. A spring install means applying over the winter.
Fall is also a good time to walk the property. After the September rain, you can see where water pools and where trucks drive over the edge of the lot. Both affect where the fence and gates can go.
What Drives the Cost of Commercial Fence Installation?
Gates, site access and ground conditions usually matter more than the length of the fence. A long, straight fence on flat, open ground can cost less than a shorter one with an automatic gate, a slope and buried rock.
Gates
Every gate adds posts, hardware and labor. An automatic gate also needs a motor, safety sensors, a power supply, and a way for people to open it, such as a keypad or remote.
Fence Type and Height
Chain link is the most common choice for yards and back lots. Ornamental steel costs more but looks finished, so it often goes where customers or tenants see it. Chain link comes in different wire thicknesses, called gauges. A lower gauge number means thicker, stronger wire. Taller fences need bigger posts and can trigger a permit.
The Ground
Posts sit in holes set in concrete. Rock, tree roots, slopes and buried utility lines all change how long that takes.
Crew Accessibility and Timing
If trucks can’t reach the fence line then the crew will need to carry materials in by hand, which takes longer. Plus, taking out an old fence adds labor and disposal. If your business stays open during the work, the crew has to work around customers, deliveries and parking.
Each of these four factors will vary based on the specific situation. Since each one changes the materials and labor a job needs, two fences of the same length can cost very different amounts.

Does a Commercial Fence Need a Permit in Tacoma or Lakewood?
In Tacoma, any fence over seven feet needs a building permit. For commercial fence installation in Lakewood, a fence in a setback or on a property line can be six feet. Anything taller needs a variance and a building permit, unless the city approves it as part of a commercial or industrial design review.
There are three terms in that rule that are worth knowing:
- Setback: The strip along your property line where the city limits what you can build.
- Variance: Special permission to go beyond a zoning rule, and it’s a separate city review on top of the building permit.
- Design review: The city’s review of a new commercial or industrial project’s plans.
If your plans call for an eight-foot security fence, it’s over the height limit in both cities, and in Lakewood it may need two approvals instead of one. Height isn’t the only rule that differs between the two cities. Both also limit how tall a fence can be near driveways and intersections, which is where corner lots get tricky, since the fence can face two streets. The table below compares four of these rules, as checked in September 2026. Codes change, so confirm the current rules with the city before you apply.
| Rule (checked September 2026) | Tacoma | Lakewood |
| Tallest fence without extra approval | 7 ft | 6 ft in setbacks and on property lines |
| Taller fence needs | Building permit | Variance and building permit, unless approved in design review |
| Barbed or razor wire | Only where it can’t be seen from a street or nearby homes | Not allowed in residential zones |
| Electric fence | Industrial zones only | Commercial, industrial and public zones, with city approval |
What Should a Commercial Security Fence or Gate Include?
A security fence has to be tall and strong enough for the site, and an automatic gate needs safety devices that protect people as well as cars. Here’s what applies to industrial yards in Lakewood, apartment complex gates, and the sensors in the pavement.
Industrial yards in Lakewood
For most industrial security fencing in Lakewood, a heavy chain link at the allowed height does the job. Lakewood’s code allows electric fencing only in certain zones and with city approval. An electric fence must be eight to ten feet tall and sit inside a regular fence at least six feet tall.
Apartment complex security gates
The gate motor should carry a UL or ETL listing mark, which shows it has been tested to UL 325, the national safety standard for automatic gates. The gate should be able to detect people in both the opening and closing directions, and the gate buttons should sit at least six feet from the gate so no one can touch the gate while using them.
Automatic gate safety loops
Safety loops are wire loops cut into the pavement that stop a gate from closing on a car. A loop works by sensing metal objects such as vehicles, so it isn’t designed to detect a person on foot. The gate still needs separate sensors to protect people.
What Should Be Decided Before the Budget Is Approved?
Decide what the fence has to do and how the gates will be used. With those answers, you can compare prices from different contractors fairly.
- The job of the fence: Security, privacy, looks, or guiding traffic. Each points to a different fence type and height.
- The gates: How many, which ones are automatic, and who uses them: cars, delivery trucks, people on foot. Fire and police access also matters.
- The height: Anything over six feet in Lakewood, or seven in Tacoma, adds a permit step.
- The site: A site plan with the fence line marked, whether old fence has to come out, and the hours your business has to stay open.
- Upkeep: Who will maintain an automatic gate after it’s installed.
Before you hire anyone, look the contractor up on the state’s L&I Verify tool. It shows whether they’re registered and bonded, and any safety citations.

Talk to Us About Your Site
If you’re planning a fence for next year, a site visit gives you a number you can budget around. We’ll walk the property with you and talk about the project you need. Fence Specialists has built fences and gates in Pierce County since 1969. Request an appointment with us today to get started!